If the bucket is worn out of the back of the bucket, don't wait until the bucket is worn and then reinforce it, so it will always let you regret it, like my boss's friend has a machine on the back of the bucket. His master called him the welding bucket. He said it was not urgent and worked first. After a few days, this dug bucket wore the bucket back directly, and two hopper two. The edge of the edge is also deformed, and the value of the bucket has no maintenance value directly discarded, and then spent 8000 yuan to buy a new fight.
First come to my personal summary. I have also seen a lot of welding method, but see the reinforcement to durable and save money is really not a few, the general welding is good, the area of the welding is added, should not add, do not add in a year.
Let's tell me about this machine. This machine has been working for more than 6800 hours now, but the real time is about 3500 hours. (the rest of the time is more than the gun), but it's more hard to dig the stones, so it hurts more. But it took so long, only four times. The new machine bought and welded one time. Last year, the bucket was welded on both sides of the bucket. In the last year, the bucket was welded on both sides of the bucket. At the time of new year's year, the bucket tooth root was welded all 5 times. (when it was worn out 1, the stone dropped, and then I took the machine, so I suggested the boss how to weld it.) finally, this one.
In this I count, if the sale of a new chain board to 160 yuan, and two blocks to come, and the area of the bag welding is not comprehensive, and not durable. Later, I took him to the scrap store to buy automobile steel plate, only 2 yuan per Jin, then bought a piece of 96 yuan, and then add a car half shaft 50 yuan. Note: to weld the steel plate to 50 yuan. The original chain plate is blown off with oxygen to weld.
In the middle, the chain plate does not wear well, so there is no need to replace it. Only one row is to be added back to the chain plate. These are all reinforced when the new plate is new, and even the backboard of the bucket has not been welded. This is the result of good maintenance.
In this case, I would like to introduce a cheap and aggressive hook for waste to treasure. This is welding with waste chain bones.
Is this welding hook better than the other hooks? And the chain bone has a good steel and more tensile strength. Notice that the welding bucket is welding a bit, and the welding is too low to scratch the ground sometimes.
Finally a summary, this is a total of two days. In fact, it spent two days. In fact, it was (a new chain plate 160 yuan, a car plate with a half axle of a car 146 yuan, the welding worker 500 yuan total 160+146+500 = 806 yuan) 806 yuan. The whole process is I watch the welding in the scene, the boss only to send the material once. If it is not I help him to discuss, he This time to spend at least 1200 yuan, but the future welding is so durable. In fact, a lot of the boss is given to me, including the small problems and the normal maintenance of the machine are all we are doing, no way, take the money, the responsibility, more for the boss, so let us be a good driver in China.