The boss is always the best man in the world, but if he doesn't know much about some industry or product, it tends to lose a sum of money. In the field of excavators, the owner of the site wants to hire a cheap excavator, but it seems to save a few hundred dollars, but it may cost you more time and more time. Wages, the final loss of big loss. We have such a case here, may as well see the boss's choice. The following is a forum net friend "boshan55" a real experience, the owner of the site can refer to the reference.
Boshan55 is a self operated excavator rental owner, self opening Daewoo 55, the price of 160 yuan per hour. Ben and a construction site boss to start, but do not want to kill a half way to bite gold, a colleague open a small dig for 120, the boss immediately gave the job to the small dug. Originally this is a very depressed matter, but the owner of another site next door to the boss. Looking for boshan55, asking whether the price can be low, boshan55 refuses, and 160 money does not drop, but never let the boss pay more money.
In this way, boshan55 began to start at the next site. As a result, the dramatic scene began to begin with.Boshan55's thought that he wanted 160 more money than the 120 of his opponent. That was all when the oil money was good at the site, so the gas was added to the maximum, and after the excavation for.5 hours, the foundation grooves of the workshops had already opened, and 120 dug that start. One hour earlier than boshan55, the same area is only half open.
Seeing boshan55 moving so fast, another boss came to find him for about second days, and then boshan55 was swelted by the mug of business in the morning. Looking at more time, boshan55 used 3.5 hours to go to another field. This day, there was a total of 8.5 hours to complete the work of two sites. When boshan55 received a phone call, the owner of the Industrial Park gave him all the work in the park. Is it a pie in the sky, of course not, because there are 120 small digs.
To calculate the cost of different owners on the site:
Boshan55:160 yuan / hour x 5 hours =800 yuan
Dug (not finished): 120 yuan / hour x 9 hours =1080 yuan
In fact, small dug suitable for what type of work to do, the site owner should have a number, can not blame people to dig the master grinding work, after all, the small digging is used to do scattered work, people are more than 9 hours, too tired. So, the better, the better, the better, the job site owners in the future can ask the master of excavators this live big How long is it going to be done?