After the excavator owners buy the new excavator, before the excavator work, first of all, we should read the operation instructions of the excavator carefully, and use and operate the excavator strictly according to the requirements of the instructions.
1 when selecting fuel for excavator, it is necessary to choose the fuel matching with the excavator type.
2 before adding fuel to the excavator, it is necessary to first deposit and filter. The digester of the excavator must be clean without impurities.
3 lubricating oil should be kept clean and the quantity should be sufficient and regularly changed. The application grades should be consistent with the regulations.
4 air filters should be kept in mind.
5, pay attention to adding cooling water, especially do not make the engine work in the condition of water shortage. If the engine is found to be cooling water, add it in time.
6 always be careful to check, fasten the relevant bolts and nuts, especially the connecting rod bolts, bolts on the drive shaft and the locking nuts on the flywheel, the fastening nuts of the wheels, etc.
7 every day before excavator operation, it is necessary to check the excavator's water tank, oil tank and check whether there is a simple excavator maintenance tool.
The 8 new machine usually changes the oil and all the filter core in 50 hours. The gear oil and hydraulic oil can be replaced at a later point. The diesel oil and the machine filter should be regularly maintained and replaced regularly. The whole car will have to beat the butter once a day.
91000 hours to replace the final drive gear oil, oil, oil filter element, diesel filter element, oil separator, hydraulic oil inlet and outlet oil filter pilot filter element, etc.
102000 hours to replace hydraulic oil, final drive, rotary gear oil, oil, hydraulic oil, oil filter core, pilot filter core, oil filter core, diesel filter, oil water separator, but every day also need to add butter (grease), check oil level, sometimes check the water level of cooling water.
11 maintenance division 5 parts, each according to the relevant specification or the corresponding specification: engine + walk + hydraulic part + frame action Department + excavating bucket. Emphasis is on the lubrication, cleaning and observation of all parts. Especially the oil and hydraulic oil are kept clean, and the rotating shaft is effectively lubricated.