Operating Instructions For The Installation Of Pile Drivers

Jun 06, 2020

Pile driver is a commonly used pile driver machine with a wide range of uses. So, what are its installation and operation procedures? Let me talk about it for you.


1. The operator of the pile driver must be familiar with the structure, performance, operation essentials and safety precautions of this machine. Only after passing the examination and obtaining the certificate can he operate it alone.


2. The operator must concentrate on the operation. Do not speak, laugh, play, or make trouble with irrelevant personnel. Smoking and eating are not allowed during operation.


3. Strictly abide by the relevant maintenance regulations of the pile driver, and do a good job of maintenance at all levels to ensure that the pile driver is always in good condition. And we must pay attention to fair use and correct operation.


4. Before working, the pile driver should make the following preparations:


1. Learn from the construction staff about the construction conditions and tasks, as well as the problems found in the construction and the matters that the class should pay attention to.


2. Adjust the position of the variable speed gear of the pile driver according to the vibration force required by the construction personnel.


3. Check whether the insulation of cables and wires is good. Check whether the controller contacts are good and the limits are correct.


4. Check whether the voltage of the power supply meets the requirements.


5. Lubricate and maintain all parts according to daily maintenance items.


5. Safety precautions of the pile driver during work:


1. When the pile driver is working, there must be someone to direct it. Commanders and operators must check signals with each other before working. Work closely.


2. At the beginning, use a bell or other means to send a signal to notify people around to leave.


3. The pile driver and the pile cap, the pile cap and the pipe column (or pile) plane should be leveled, the connecting bolts should be tightened, and regular checks should be made for looseness.


4. The starting of the pile driver should be accelerated from low gear to high gear.


5. The pile driver should pay close attention to the indication of current and voltage on the control panel. If abnormal noise or other abnormal conditions are found, the machine should be shut down for inspection immediately.


6. Always check the bearing temperature and bearing cover screws for looseness, and strictly check for looseness of the eccentric iron block coupling screws to prevent accidents.


7. It is strictly forbidden to stand around the pipe column (or pile) when sinking.


8. When the pile driver cooperates with water injection and mud suction, it should contact the relevant personnel in advance and take photos with each other in the work.


9. When connecting a long pipe string or pile and installing a pile cap, the worker must wear a seat belt.


10. During the sinking process, it is strictly forbidden to maintain and maintain the machine.


6. After the pile driver stops working, the power supply should be cut off immediately, and the pile driver and motor should be inspected and maintained.


7. The pile driver shall be kept in storage for a long time, the motor shall be protected against moisture, and the instruments on the control panel shall be removed and packed for storage.