The area of the farmland is 1.5 mu, which is rectangular, and the employer demands to dig 50~60 cm as a whole. The pond ridge requires a straight line and 1.5 meters high. The countryside is not more than the construction site of the city. You have to do it according to the requirements of the constructors. The employers in the countryside are all the people. They do not understand the professional technology in this aspect, but they are just about the prototype. All the others are judged by the experience of our own hands and their own experience. Well!
I looked down to the point that the three side was other farmland that could not be put on the ground, and the other side was to put extra soil on the machine road, so I went down from this side of the field. The position of the excavator was about 2.5 wide, and the width of my excavator was 2.6 meters, and I had just dug the whole pile of earth in the field. The 2.5 meters of the ridge is the ridge of the pond. The employer's requirement is straight line, so when you dig backward, you must go straight. Dig in accordance with track marks in turn.
The height of the pile is higher than 1.5 meters. Later, we need to beat it.
Side pile side with the bucket compaction, because the one-time heap height can be leaking, repair fish pond is the most basic is not leaking, otherwise good looking is also unqualified 名媛直播!
The pile of the pond in the pond is almost the same, and it starts to find the level of height, and the low place can dig up the remaining soil in the middle. It is better to close the edge of the pond at the edge of the pond, so that the height can be measured clearly and accurately.
After high leveling, you can throw the excess soil into the side of the tractor farm. The bottom of the pond should be dug out. At least the drainage outlet can not be high. Otherwise, the pond will catch fish later. If the water is not clean, it will make a joke.
Don't stay too long in the mud. Walk away from the big arm.
The surplus soil is over, and the bottom is still flat.
When the foundation is flat, the pond bank should be well, while the excavator is still in the pond, the excavator is placed in parallel with the distance of 2.5 meters wide. After walking through the deeper silt, you can conveniently and smoothly pass the mark, and so on!
The same is the case outside!
All right. 13 hours later, such a small farm converted fish pond was completed.
After seeing the idea of a frog in the well, let's look at another post that a friend Hai Quan once published in March 14, 2013.
The fish pond below is also a land of fish and rice in Hubei Xiantao area. The fish pond will be silted up in November every year. In the first few years there is a newly developed fish pond. It is now upgraded, reformed, silted up, and there are many ways to upgrade the fish pond. The gun plate machine, bulldozer, mud pump, and our "excavator" upgrade, and the business is very good. To farmers directly work, eat well every day, drink well, smoke, the price is good, very comfortable. Although the conditions are good, the construction environment is really bad. It is very common, especially in the low Lake field, to say how to avoid the car, how to save the energy and the transformation of the fish pond.
First of all, we should know the width and net width of the fish pond, the area of the old embankment, the depth of the silt, and the degree of soil softness and hardness. How do you get the first shovel? Of course, it is a meeting. If the condition of soil is allowed, it is the middle of the fish pond. (if you divide 1 sides and 25 meters to get to the embankment, it is to turn 10 meters of soil. Can you understand this? The fishpond is 4 horns, so we must adjust the soil on the corner so that we can get the soil in the middle of the fish pond evenly. The purpose of dredging is to clear the soil in the middle of the fish pond to the dyke.
Digging machine fishpond also has the independent operation, to everybody on the point of independent operation of the map, iron plate, fish pond necessary, even if not trapped, with insurance.
Like this kind of fishpond, which has no soil area, it is usually just a turn, the Bank of the bank, such a fish pond is very simple, standing on the original side of the old slope, and digging a circle.
The second is a fishpond with a normal shape. It should be divided into soil, soil and general single operation. The fish pond within 40 meters wide is the most easy to handle, and the soil is better.
Slope ratio is also the key, especially when you look at the time or contract you do, if the contract, the higher the slope, the less time, the profit is relatively higher, if the time is to do, according to the requirements of the east to do the slope, generally is done 1 to 3 of the slope.
I really admire the man of Kaikato, without iron board, mud about 1.2m, directly like a bulldozer running in the fish pond, too great. 17000 yuan a fish pond, 4 days and a half (Bai Bano).
Note: do not repeat the driveway in the fishpond without the iron plate, and try to calculate the distance to the earth. Before the next pool, know if there are any dark pits, or old trenches, and try to find a way to find a bucket. If there is a trap, no move, do not save yourself if you are not sure. The deeper it is.
Let's talk about cooperation, digging machines and excavators, and cooperate with excavators and bulldozers. Digging machine and digging machine cooperate with each other, it is simple and duer, one dig one turn, one on the top, and one on the slope.
The cooperation between excavators is a bit tacit understanding, and the rear car should follow the front car. Because of the soil in the fish pond, it is not allowed to roll many times at all, so where the car ahead digs, the car behind will follow where to turn. This is suitable for any fish pond, and the operation will be more daring, and at least not afraid of falling inside.
The cooperation between the excavator and the bulldozer, in general, is a large fish pond, and the excavator is very hard to turn the earth into the earth, so it is combined with the bulldozer, the premise is that the bottom of the pond can bear the weight of the bulldozer. Otherwise, there is no work efficiency in the case of too much silt. In cooperation with bulldozers, excavators are required to start the construction of the earth and break the dykes of the old dykes. Breaking the embankment is also required, the foot of the old slope can not move, otherwise easy to collapse, at intervals of tens of meters must be left partition, otherwise fear that the height of the embankment can not be done.
This is the middle without leaving the partition, resulting in the collapse of the dyke. Remember!
The coordination between the bulldozer is much more complex, mainly to see the technology of the bulldozer master, he wants to send soil when you want the soil, it is the silt of the surface first, and then when you don't have the soil, the soil should be completely absorbed.
When the height of the embankment is done, bulldozers will be pushed up with hard soil and the hard soil will be revetment.
Now many fish ponds are not cleaned for many years, because the road is not clear, equipment can not enter the scene, so more than 10 years of fish ponds have. This is one of the fish ponds recently cleaned by us. It has not been washed for 12 years, and there are many silts.
Anyone who's dug a fish pond knows it's a pain in the neck, but for a digger owner, high prices and cash checks are the best temptations. So many masters have to do, but also pay attention to safety, especially the single machine operation, there is no equipment in the vicinity of the situation, in order to prevent the sinking of the car, must not be numb directly down the pool, it is easy to lose the loss... !
Through the above examples, have you learned how to dig fishponds? How much do you learn? There will be no future work, you can go to our forum search Oh! There are a lot of cards that we need to learn.