1. Precautions for engine use
1. After the new engine or overhaul, the diesel engine cannot work at full load and high speed at the beginning. It must be run in at low speed and light load for 50 hours before it can be transferred to normal operation.
2. Ensure the cleanliness of the fuel. Filter through sediment or silk cloth if necessary.
3. Maintain normal water temperature (70~85℃) and oil pressure (0.2~0.4MPa at medium speed).
4. During operation, if any abnormality is found, stop and check immediately.
5. "Hard water" should not be used as cooling water to prevent scale formation and reduce the service life of the engine.
Second, daily maintenance
1. Check whether the oil level in the oil pan is between the two engraved lines on the oil scale and close to the upper engraved line. The new engine or the diesel engine that has been out of service for a long time will be stopped after 5 to 10 minutes of operation at low speed after refueling the engine with oil.
2. Check the water volume of the water tank.
3. Check the oil level in the fuel injection pump. If it is insufficient, it should be added to the specified position.
4. Eliminate the phenomenon of three leaks (oil, water, gas).
5. Check the firmness of parts and accessories.
6. Check the cleaning situation, remove oil and dust, pay special attention to the drying and cleaning of electrical equipment.
7. After the 50-hour light load operation of the new engine, the engine oil (including the oil in the fuel injection pump) and the oil filter element should be replaced in time, and the oil pan and the oil collecting filter should be cleaned.
8. Timely protection of daily lubricant additives.